yph-18-807475

The concrete that forms the floor of the Mechanical Electrical Building was placed in November. The next step is installing structural steel on the second level.
The concrete that forms the floor of the Mechanical Electrical Building was placed in November. The next step is installing structural steel on the second level.
Tags: