yph-18-807490

An ironworker ties rebar on the second level of the Mechanical Electrical Building in preparation for elevated concrete placement and structural steel for the second floor.
An ironworker ties rebar on the second level of the Mechanical Electrical Building in preparation for elevated concrete placement and structural steel for the second floor.
Tags: