yph-19-837313

Structural steel continues to be installed at the Uranium Processing Facility Project’s Salvage and Accountability Building. The steel columns currently being installed are about 60 feet tall and weigh between 10.5 and 12.5 tons each.
Structural steel continues to be installed at the Uranium Processing Facility Project’s Salvage and Accountability Building. The steel columns currently being installed are about 60 feet tall and weigh between 10.5 and 12.5 tons each.
Tags: