yph-18-806784

Rebar is being placed for the walls of the Main Process Building. The square frame is for an emergency egress door and weighs 22,000 lbs.
Tags

Rebar is being placed for the walls of the Main Process Building. The square frame is for an emergency egress door and weighs 22,000 lbs.