The Uranium Processing Facility (UPF) project is dedicated to the concept that all accidents are preventable. Accordingly, we are committed to achieving and sustaining “Zero Accident Performance”. The links below provide the Bechtel National, Inc. (BNI) Safety and Health Program implementation procedures. These procedures are provided to assist bidders in the preparation of proposals and for subcontractors to implement when performing work under a BNI subcontract agreement.
UPF Safety Procedures
| Document Number | Revision | Title |
|---|---|---|
| APA-2HC-E0A0-000104-001 | 0 | Core Process 104 Injury and Illness Reporting and Recordkeeping |
| APA-UPF-NSE-00011 | 1 | Bechtel National Incorporated (BNI) Workplace Substance Abuse Plan |
| JHA-00712 | 1 | UPF Job Hazard Analysis, Barricades, PPE, FLHA |
| JHA-00713 | 1 | UPF Job Hazard Analysis, Compressed Gas, LPG, and Inert Gas |
| JHA-00715 | 1 | UPF Job Hazard Analysis |
| JHA-00716 | 0 | UPF Job Hazard Analysis, Electrical Safety, LOTO, and Equipment and Components Installation |
| JHA-00717 | 5 | UPF Job Hazard Analysis, Elevated Work |
| JHA-00718 | 0 | UPF Job Hazard Analysis, Excavation and HDPE Piping |
| JHA-00719 | 2 | UPF Job Hazard Analysis, Fire Prevention, Protection, Hot Work and Welding |
| JHA-00720 | 6 | UPF Job Hazard Analysis, General Sites Activities |
| JHA-00721 | 1 | UPF Job Hazard Analysis, Hand and Power Tools |
| JHA-00722 | 1 | UPF Job Hazard Analysis, Hoisting, Rigging, and Material Handling |
| JHA-00723 | 0 | UPF Job Hazard Analysis, Housekeeping and Grounds Maintenance |
| JHA-00724 | 0 | UPF Job Hazard Analysis, Industrial Hygiene and Environmental Protection |
| JHA-00725 | 3 | UPF Job Hazard Analysis, Scaffold Assembly and Disassembly |
| JHA-00726 | 0 | UPF Job Hazard Analysis, Startup Operations and Emergency Response |
| JHA-00727 | 1 | UPF Job Hazard Analysis, Testing and NDA |
| JHA-00728 | 4 | UPF Job Hazard Analysis, Vehicle Safety Management, PITs, and MEWPs |
| JHA-00737 | 2 | UPF Job Hazard Analysis, Electrical Conduit and Equipment Installation |
| JHA-00738 | 2 | UPF Job Hazard Analysis, Electrical Cable Pulling - Indoor on Non-Energized Trays |
| JHA-00739 | 0 | UPF Job Hazard Analysis, Electrical |
| JHA-00740 | 0 | UPF Job Hazard Analysis, Electrical Testing |
| JHA-00741 | 1 | UPF Job Hazard Analysis, Electrical Supports Installation |
| JHA-00742 | 2 | UPF Job Hazard Analysis, I&C Installation of Tubing and Instruments |
| JHA-00743 | 3 | UPF Job Hazard Analysis, I&C Supports Installation |
| JHA-00744 | 2 | UPF Job Hazard Analysis, Installation of Piping, Supports, and in-line Components |
| JHA-00745 | 2 | UPF Job Hazard Analysis, Civil Excavation and Backfill |
| JHA-00746 | 4 | UPF Job Hazard Analysis, Civil Concrete Placement, Formwork, and Penetration, PIA's and Embeds |
| JHA-00747 | 0 | UPF Job Hazard Analysis, glovebox Pressure Testing |
| JHA-00748 | 0 | UPF Job Hazard Analysis, Glovebox and Components Polishing |
| JHA-00749 | 2 | UPF Job Hazard Analysis, Installation of Modular Mechanical Equipment |
| JHA-00750 | 3 | UPF Job Hazard Analysis, Removal and Installation of Insulation |
| JHA-00751 | 0 | UPF Job Hazard Analysis, General Carpentry |
| JHA-00752 | 4 | UPF Job Hazard Analysis, Structural Steel Installation and Misc. Metal Work |
| JHA-00754 | 0 | UPF Job Hazard Analysis, Temporary Power Support Activities |
| JHA-00756 | 0 | UPF Job Hazard Analysis, Interior Finishes |
| JHA-00757 | 0 | UPF Job Hazard Analysis, Electrical - Installation of Light Poles, Direct Burial Cable, and Outdoor Cable Pulling |
| JHA-00760 | 1 | UPF Job Hazard Analysis, Installation of Sprinkler Pipe, Supports and Associated Hardware |
| JHA-00761 | 3 | UPF Job Hazard Analysis, Installation of HVAC Duct, Supports and Associated Hardware |
| JHA-00762 | 0 | UPF Job Hazard Analysis, Application of Specialty Coatings and Surface Preparation |
| JHA-00763 | 1 | UPF Job Hazard Analysis, Installation of Penetration Sealants |
| JHA-00764 | 0 | UPF Job Hazard Analysis, Working Around Energized Cables |
| JHA-00765 | 1 | UPF Job Hazard Analysis, K31 Waterline Replacement |
| JHA-00766 | 1 | UPF Job Hazard Analysis, Warehouse Handling and Inspection of Aerogel Materials |
| PL-SH-801768-A007 | 3 | Bechtel National Inc. Uranium Processing Facility (UPF) Environment, Safety, and Health Plan |
| PL-SH-801768-A009 | 1 | UPF Construction Environmental Control Plan |
| PL-SH-801768-A023 | 0 | UPF Exposure Control Plan for Bloodborne Pathogens |
| TGUI-TR-801768-A003-DC | 13 | UPF Training Requirements Matrix (TRM) |
| UPF-CP-102 | 6 | Orientation, Training & Development |
| UPF-CP-105 | 0 | Risk Assessment and Objectives |
| UPF-CP-200 | 12 | UPF General Safe Work Practices |
| UPF-CP-203 | 0 | UPF Dropped Object Prevention |
| UPF-CP-205 | 14 | Personal Protective Equipment and safe work apparel |
| UPF-CP-207 | 6 | UPF Powered Industrial Trucks Page |
| UPF-CP-211 | 12 | Fire Prevention and Protection |
| UPF-CP-214 | 11 | Barricades and Signs |
| UPF-CP-225 | 4 | Compressed Gas Cylinders, Liquefied Petroleum Gas, and Liquefied Inert Gases |
| UPF-CP-227 | 9 | UPF Safety Watches |
| UPF-CP-229 | 6 | UPF Safety Management |
| UPF-CP-312 | 5 | Hearing Conservation Program |
| UPF-CP-314 | 10 | Heat and Cold Stress Prevention |
| UPF-CP-315 | 5 | Automated External Defibrillator (AED) Requirements |
| UPF-CP-318 | 3 | Respirator Use and Issuance |
| UPF-CP-319 | 0 | Welding Fume Management |
| UPF-MANUAL-CM-001 | 8 | Uranium Processing Facility Construction Electrical Safety Manual |
| UPF-MANUAL-SH-A001 | 6 | UPF Elevated Work Manual |
| UPF-POLICY-CM-001 | 4 | UPF Life Critical Requirements |
| UPF-POLICY-CM-002 | 4 | UPF Weather Protocols |
| UPF-POLICY-CM-004 | 0 | UPF Smoking/Tobacco Use Policy |
| Y15-95-301 | 0 | Incident Review Board Procedure |
| Y17-95-64-801 | 9 | UPF Construction Phase System and Equipment Safety Lockout/Tagout |
| Y17-95-64-822 | 12 | UPF Site Excavation and Backfill |
| Y17-95-64-823 | 9 | UPF Safety Task Analysis and Risk Reduction Talk/Job Hazard Analysis Program (STARRT/ JHA) Process |
| Y17-95-64-823UPF | 9 | Safety Task Analysis and Risk Reduction Talk/Job Hazard Analysis Program (STARRT/ JHA) Process |
| Y17-95-64-831 | 9 | UPF Scaffold Control and Management |
| Y17-95-64-837 | 4 | UPF Housekeeping |
| Y17-95-64-871 | 5 | UPF Construction Hoisting and Rigging Work Operations |
| Y17-95-64-872 | 4 | UPF Crane Use and Operation |
| Y17-95-64-873 | 3 | UPF Qualification of Construction Crane Operators |
| Y17-95-64-874 | 3 | UPF Rigger, Signal Person and Competent Person Rigger Qualification |
| Y17-95-64-875 | 2 | UPF Control of Hoisting and Rigging Equipment |
| Y17-95-64-877 | 6 | UPF Hot Work Permit |
| Y17-95-64-899 | 0 | UPF Bull Rigging Operations |
| Y17-95-64-900 | 1 | UPF Bull Rigger Qualifications |
| Y72-95-003 | 1 | Silica Exposure Control Procedure for Construction of the Uranium Processing Facility Project |
| Y73-95-801 | 1 | UPF Analysis of Standard Industrial Hazards in the Design Process |
| Y73-95-802 | 2 | Confined Space Entry Program |
| Y73-95-803 | 0 | Hexavalent Chromium Procedure |
| Y73-95-804 | 2 | UPF Project Industrial Hygiene Exposure Assessment & Surveillance Strategy and Process |