UPF Safety Procedures

The Uranium Processing Facility (UPF) project is dedicated to the concept that all accidents are preventable. Accordingly, we are committed to achieving and sustaining “Zero Accident Performance”. The links below provide the Bechtel National, Inc. (BNI) Safety and Health Program implementation procedures. These procedures are provided to assist bidders in the preparation of proposals and for subcontractors to implement when performing work under a BNI subcontract agreement.

Document Number Revision Title
JHA-00744 2 UPF Job Hazard Analysis, Installation of Piping, Supports, and in-line Components
JHA-00745 2 UPF Job Hazard Analysis, Civil Excavation and Backfill
JHA-00746 1 UPF Job Hazard Analysis, Civil Concrete Placement, Formwork, and Penetration, PIA's and Embeds
JHA-00747 0 UPF Job Hazard Analysis, glovebox Pressure Testing
JHA-00748 0 UPF Job Hazard Analysis, Glovebox and Components Polishing
JHA-00749 2 UPF Job Hazard Analysis, Installation of Modular Mechanical Equipment
JHA-00750 3 UPF Job Hazard Analysis, Removal and Installation of Insulation
JHA-00751 0 UPF Job Hazard Analysis, General Carpentry
JHA-00752 4 UPF Job Hazard Analysis, Structural Steel Installation and Misc. Metal Work
JHA-00754 0 UPF Job Hazard Analysis, Temporary Power Support Activities
JHA-00756 0 UPF Job Hazard Analysis, Interior Finishes
JHA-00757 0 UPF Job Hazard Analysis, Electrical - Installation of Light Poles, Direct Burial Cable, and Outdoor Cable Pulling
JHA-00760 1 UPF Job Hazard Analysis, Installation of Sprinkler Pipe, Supports and Associated Hardware
JHA-00761 3 UPF Job Hazard Analysis, Installation of HVAC Duct, Supports and Associated Hardware
JHA-00762 0 UPF Job Hazard Analysis, Application of Specialty Coatings and Surface Preparation
JHA-00763 1 UPF Job Hazard Analysis, Installation of Penetration Sealants
JHA-00764 0 UPF Job Hazard Analysis, Working Around Energized Cables
JHA-00765 1 UPF Job Hazard Analysis, K31 Waterline Replacement
JHA-00766 1 UPF Job Hazard Analysis, Warehouse Handling and Inspection of Aerogel Materials
PL-SH-801768-A007 3 Bechtel National Inc. Uranium Processing Facility (UPF) Environment, Safety, and Health Plan
PL-SH-801768-A009 1 UPF Construction Environmental Control Plan
PL-SH-801768-A023 0 UPF Exposure Control Plan for Bloodborne Pathogens
UPF-CP-102 6 Orientation, Training & Development
UPF-CP-105 0 Risk Assessment and Objectives
UPF-CP-200 11 UPF General Safe Work Practices