UPF Safety Procedures
The Uranium Processing Facility (UPF) project is dedicated to the concept that all accidents are preventable. Accordingly, we are committed to achieving and sustaining “Zero Accident Performance”. The links below provide the Bechtel National, Inc. (BNI) Safety and Health Program implementation procedures. These procedures are provided to assist bidders in the preparation of proposals and for subcontractors to implement when performing work under a BNI subcontract agreement.
Document Number | Revision | Title |
---|---|---|
JHA-00744 | 2 | UPF Job Hazard Analysis, Installation of Piping, Supports, and in-line Components |
JHA-00745 | 2 | UPF Job Hazard Analysis, Civil Excavation and Backfill |
JHA-00746 | 1 | UPF Job Hazard Analysis, Civil Concrete Placement, Formwork, and Penetration, PIA's and Embeds |
JHA-00747 | 0 | UPF Job Hazard Analysis, glovebox Pressure Testing |
JHA-00748 | 0 | UPF Job Hazard Analysis, Glovebox and Components Polishing |
JHA-00749 | 2 | UPF Job Hazard Analysis, Installation of Modular Mechanical Equipment |
JHA-00750 | 3 | UPF Job Hazard Analysis, Removal and Installation of Insulation |
JHA-00751 | 0 | UPF Job Hazard Analysis, General Carpentry |
JHA-00752 | 4 | UPF Job Hazard Analysis, Structural Steel Installation and Misc. Metal Work |
JHA-00754 | 0 | UPF Job Hazard Analysis, Temporary Power Support Activities |
JHA-00756 | 0 | UPF Job Hazard Analysis, Interior Finishes |
JHA-00757 | 0 | UPF Job Hazard Analysis, Electrical - Installation of Light Poles, Direct Burial Cable, and Outdoor Cable Pulling |
JHA-00760 | 1 | UPF Job Hazard Analysis, Installation of Sprinkler Pipe, Supports and Associated Hardware |
JHA-00761 | 3 | UPF Job Hazard Analysis, Installation of HVAC Duct, Supports and Associated Hardware |
JHA-00762 | 0 | UPF Job Hazard Analysis, Application of Specialty Coatings and Surface Preparation |
JHA-00763 | 1 | UPF Job Hazard Analysis, Installation of Penetration Sealants |
JHA-00764 | 0 | UPF Job Hazard Analysis, Working Around Energized Cables |
JHA-00765 | 1 | UPF Job Hazard Analysis, K31 Waterline Replacement |
JHA-00766 | 1 | UPF Job Hazard Analysis, Warehouse Handling and Inspection of Aerogel Materials |
PL-SH-801768-A007 | 3 | Bechtel National Inc. Uranium Processing Facility (UPF) Environment, Safety, and Health Plan |
PL-SH-801768-A009 | 1 | UPF Construction Environmental Control Plan |
PL-SH-801768-A023 | 0 | UPF Exposure Control Plan for Bloodborne Pathogens |
UPF-CP-102 | 6 | Orientation, Training & Development |
UPF-CP-105 | 0 | Risk Assessment and Objectives |
UPF-CP-200 | 11 | UPF General Safe Work Practices |